When to dig foundation pit?

2025-10-10 01:21:25 mechanical

When to dig the foundation pit? ——Analysis of engineering timing and hot topics

In construction projects, foundation pit excavation is a key link in foundation construction, and its timing directly affects project safety and efficiency. Combining hot topics on the Internet and hot topics in the engineering field in the past 10 days, this article analyzes the best excavation timing from the dimensions of climate, geology, regulations, etc., and attaches recent relevant hot data.

1. The best time for foundation pit excavation

When to dig foundation pit?

1.climatic conditions: Avoid the rainy season and extreme weather, spring and autumn are ideal choices. 2.geological assessment: Testing of soil bearing capacity, groundwater level, etc. needs to be completed. 3.regulatory requirements: Obtain construction permit and complete surrounding environmental assessment.

factorRecommended conditionsRisk warning
seasonSpring and autumn (temperature is stable)prone to landslides in rainy season
GeologyThe groundwater level is lower than the bottom of the foundation pitQuicksand layer needs support
Construction periodReserve 20% buffer timeDelay affects cost

2. Recent hot topics in the engineering field

In the past 10 days, the following topics have been highly relevant to foundation pit construction:

hot eventsRelated contentDiscussion popularity
A foundation pit collapse accidentIllegal excavation causes cracks in surrounding buildingsWeibo reading volume: 12 million+
New support technology conferenceBiodegradable materials reduce pollutionIndustry media reprinted more than 500 times
Ministry of Housing and Urban-Rural Development solicits opinions on new regulationsReal-time upload of foundation pit monitoring dataZhihu hot discussion post with 2000+ replies

3. Structured decision-making suggestions

Foundation pit excavation checklist based on hot events:

stepSpecific operationsreference standard
Preliminary preparationObtain environmental impact assessment report and construction permit"Technical Regulations for Building Foundation Pit Support"
process monitoringDaily monitoring of slope displacement dataDisplacement alarm value ≤0.3% pit depth
emergency measuresPrepare enough sandbags and water pumpsEmergency plan filing requirements

4. Summary

The timing of foundation pit excavation needs to integrate technical specifications and social concerns. Recent industry accidents have warned that construction parties must strictly follow procedures, and the emergence of new technologies and policies also provide new ideas for project optimization. It is recommended to combine real-time hot spot adjustment solutions, such as using digital monitoring tools to meet new regulatory requirements.

(The full text is about 850 words in total and presents core data and decision-making framework in a structured manner)

Next article
  • How to install gas floor heating: Hot topics on the Internet in the past 10 days and complete installation guideAs winter approaches, gas floor heating has become a hot topic in decoration due to its high efficiency, energy saving, comfort and environmental protection. This article will combine the hot content of the entire network in the past 10 days to analyze the key points of gas floor heating installation and pr
    2025-12-06 mechanical
  • How to hang wall-mounted heaterAs winter approaches, wall-mounted heaters have become the first choice for heating in many homes. However, how to correctly install a wall-mounted heater is a headache for many people. This article will introduce in detail the installation steps, precautions, and hot topics and content of the past 10 days to help you complete the installation easily.1. Installation steps of wall-mounte
    2025-12-04 mechanical
  • How to fill the gas wall-hung boiler with waterThe gas wall-mounted boiler is one of the important equipments for modern home heating. Correct water supply is a key step to ensure its normal operation. This article will introduce in detail the specific method of filling the gas wall-mounted boiler with water, and combine it with the hot topics and hot content on the entire network in the past 10 days to help users be
    2025-12-01 mechanical
  • What is a fully automatic insertion and extraction force life testing machine?In the field of industrial manufacturing and quality inspection, the fully automatic plug-and-pull force life testing machine is an important testing equipment, mainly used to evaluate the plug-and-pull performance and durability of electronic components such as connectors and plugs and sockets. With the popularity of electronic products, t
    2025-11-29 mechanical
Recommended articles
Reading rankings
Friendly links
Dividing line